Metal Mountain Equipment

2022 Gascon Vessel (22,000L Capacity) MAWP 249.5 PSI

Sold

This unit is no longer available. Similar equipment is listed below — or tell us what you're looking for and we'll connect you when a match lands.

Browse all ASME Vessels available now →
2022 Gascon Vessel (22,000L Capacity) MAWP 249.5 PSINew

Specifications

ManufacturerGascon ADO Southey Holding (Pty) Ltd
ModelA17,2.220A
Year2022
ConditionNew
Capacity22,000 Liters
MAWP249.5 PSIG at 50°C
Inner Vessel MaterialSA 240 304
Outer Vessel MaterialSA516 GR 70 N
Design CodeASME VIII Div. 1 2021 Appendix 44
Tare Mass7,500 kg
Gas ServiceNitrogen, Oxygen, Argon, Nitrous Oxide
LocationWaxahachie, TX, United States
Stock #GE4S-1147

Description

2022 Gascon Vessel (22,000L Capacity) MAWP 249.5 PSI

This is a 2022 Gascon A17,2.220A vacuum-insulated cryogenic transport tank with a 22,000 liter water capacity, manufactured by Gascon ADO Southey Holding (Pty) Ltd in South Africa. The vessel is rated for 249.5 psi MAWP at 50°C and carries multiple international approvals including US DOT UN Portable T75 (IA-8106), ADR/RID, IMDG, Transport Canada, and CSC. The inner vessel is built to ASME VIII Div. 1 2021 Appendix 44 with SA 240 304 stainless steel inner tank and SA516 GR 70 N outer tank. It is new condition with serial number P44797 and remains unopened.

Manufacturing Information

Country of Manufacture: South Africa

Year of Manufacturing: 2022

Manufacturer: Gascon ADO Southey Holding (Pty) Ltd

Manufacturer Serial Number: P44797

Manufacturer Model: A17,2.220A

Gas Con Specifications

Pressure@ 50degrees Celcius

MAWP: +17.2 bar +249.5 psi (g)

Test Pressure: +24.4 bar +353.9 psi(g)

Design Temperature@17.2 bar

Inner Tank(TS): -320 degrees Farenheight to +122 degrees Farenheight

Outer Tank: -40 degrees Farenheight to +122 degrees Farenheight

Materials

Shell Materials & Material Standard Reference

Inner: SA 240 304

Outer: SA516 GR 70 N

Equivalent Thickness in Reference Steel

Shell: 10.25 mm

Heads: 10.63mm

Capacity

Tank Water: 22,000 Liters

Maximum Permissible Gross Mass: 36,000kg

Tare Mass: 7,500kg

Insulation

Vacuum Insulated

Heat Influx: 0.71 W/K

Holding Times

UN 1977 Nitrogen:

Holding times in days: 69. Initial Pressure: 0 bar, Max allowable Payload(Kg): 12711, Initial Filling% 71.7

UN1073 Oxygen

Holding times in days: 100 Days, Initial Pressure: 0 bar, Max allowable Payload(Kg): 23526, Initial Filling% 77.0

UN 1951Argon

Holding times in days: 79, Initial Pressure: 0 bar, Max Allowable Payload(Kg): 23526, Initial Filling% 76.6

UN 2201 Nitrous Oxide

Holding times in days: 352. Initial Pressure: 0 bar, Max Allowable Payload(Kg): 21,486, Initial Filling% 79.4

Approval Information

Authorized Body for Design Approval: Bureau Veritas

Country of Approval: France

ADR/ RID Approval: F/8821/ BV/ 22

IMDG Approval: F/ BV/ 22/ 139-T75

US/ DOT Approval Number: UN Portable T75 IA-8106

UIC Approval Railway Code: IRS 50592

Transport Canada Approval: TC Impact Approved

Other Approvals: CSC/ TIR/ Customs

Inner Pressure Vessel Design Code: ASME VIII Div. 1 2021 Appendix 44

CSC Safety Approval Plate

Approval Number: F/ BV/ 17083/22

Maximum Gross Mass: 36,000 Kg

AllowableStacking Load For 1,8g: 213,360 Kg

Transverse Racking Test Force: 150 kN

Next Examination Date: 10/2027

Inspection, shipping & payment

Inspection Pre-purchase inspections are welcome during normal business hours by appointment arranged in advance. We can provide complimentary transportation from DFW Airport and back if you would like to send someone to see the equipment in person. We can also walk through the item over a video call for domestic or international buyers. We are on US Central Time. Shipping and loading The equipment is located at our yard south of Dallas, Texas. We can assist with shipping arrangements. Loading is provided at no charge for equipment under 15,000 lb when scheduled in advance. Equipment over 15,000 lb requires a crane, which is arranged and paid for by the buyer. Payment Payment in full is required FOB our yard in South Dallas. A verifiable cashier's check is accepted for collection in person. For release to a third-party shipper we require a wire transfer cleared in our account before the equipment leaves the yard.

Terms set by Gas Equipment 4 Sale.

Sold

Looking for something similar? We know who has one.

LocationWaxahachie, TX, United States
Stock #GE4S-1147

Have one like this? Sell it on Metal Mountain →

Seller

Gas Equipment 4 Sale

Waxahachie, TX, United States

Verified

Business and location confirmed by Metal Mountain.

Questions buyers ask

Is this ASME or DOT rated, and what does that allow me to do with it?

This vessel carries both ASME VIII Div. 1 2021 Appendix 44 certification for the inner pressure vessel and US DOT UN Portable T75 (IA-8106) approval for transport. The ASME construction qualifies it for stationary service, while the DOT portable tank approval, along with ADR/RID, IMDG, Transport Canada, and CSC certifications, allows it to be used as an ISO container for international multimodal cryogenic transport. The dual rating gives you flexibility to use it either as a fixed storage vessel or as a transport tank, though confirming your specific regulatory jurisdiction is advisable.

What is the MAWP and capacity at service pressure?

The MAWP is 249.5 psig at 50°C (17.2 bar), with a 22,000 liter water capacity. The manufacturer specifies payload capacities at various service pressures for different cryogens: 12,711 kg nitrogen at 71.7% fill, 23,526 kg oxygen at 77.0% fill, 23,526 kg argon at 76.6% fill, and 21,486 kg nitrous oxide at 79.4% fill, all starting from 0 bar initial pressure. Maximum permissible gross mass including tare is 36,000 kg with a 7,500 kg tare weight.

What is the requalification or inspection status?

The CSC next examination date is listed as 10/2027. As a new, unopened 2022 vessel, it should be current on all certifications, but ISO tank containers typically require periodic inspections at 2.5 or 5-year intervals depending on the testing scheme, and ASME vessels in stationary service follow jurisdictional inspection requirements that vary by state and service. Verify with the seller that all original test documentation, ASME U-1 forms, and DOT certification paperwork are included and confirm your jurisdiction's specific requirements.

What should I inspect before putting it into service?

Since this is listed as new and unopened, verify the vacuum integrity and insulation performance by checking the holding time against manufacturer specifications—any significant degradation suggests vacuum loss or shipping damage. Inspect all valves, pressure relief devices, and instrumentation ports for shipping damage, confirm all nameplate data matches the documentation including serial number P44797, and verify the inner SA 240 304 stainless steel tank shows no contamination if opened. For cryogenic service, proper mounting, grounding, and venting provisions are critical, and you'll need to confirm compatibility with your intended gas if switching from the manufacturer's specified service products.

General guidance for this type of equipment. Ask about this specific unit in your inquiry — the seller answers directly.

Be first to see equipment like this

New matching inventory, straight to your inbox. Unsubscribe anytime, no spam.

Email this

Similar equipment available now

Comparable units currently listed on Metal Mountain.