New SurplusSpecifications
ManufacturerBW Systems
Year2014
ConditionNew Surplus
Gas ServiceLNG
Previous ServiceLNG station control center
LocationWaxahachie, TX, United States
Stock #GE4S-1095
Description
This is a 10x10 heavy-duty enclosed control center built in 2014 by BW Systems for a standalone LNG public fueling station for a major U.S. energy company. It houses dual Allen-Bradley CompactLogix and GuardLogix PLCs across four fully populated racks—one dedicated safety controller (L43S), one standard controller (L43), extensive safety-rated I/O, and prewired redundant power and communication infrastructure. The system is new surplus, prewired and preconfigured, and sits in Waxahachie, TX.
Panel Builders & Integrators: This is not a basic panel. This is a turnkey, customizable industrial control system with extensive I/O options, safety-rated modules, and remote-ready infrastructure. It includes:
(4) Fully Populated PLC Racks
Dual PLC setup with a dedicated Safety PLC (L43S)
Pre-wired for redundant power, control logic, safety interlocks
Ideal for Panel Build Automation Users, safety-focused industries, and LNG infrastructure
Core System Summary
Controllers
1x 1768-L43 – CompactLogix Controller (2MB Memory)
1x 1768-L43S – Compact GuardLogix Safety Controller
Communication
3x 1768-ENBT – Ethernet/IP Modules
1x MVI69E-GSC – ProSoft ASCII Communication Module
2x 1734-AENTR – Remote I/O Adapters (Dual-Port)
Power
2x 1768-PB3 – Power Supplies
Multiple 1734-EP24DC & 1734-FPD – I/O Power Distribution
Digital Inputs
48x 1769-IQ16 – 10–30VDC Digital Inputs
32x 1734-IB8S – Safety Dual-Channel Inputs
Digital Outputs
16x 1769-OB16 – Standard Digital Outputs
48x 1734-OB8S – Safety Dual-Channel Outputs
Analog Inputs
24x 1769-IF8 – Standard Analog Inputs (Current/Voltage)
32x 1734-IE4S – Safety Analog Inputs (Current/Voltage)
Analog Outputs
4x 1769-OF4 – Standard Analog Outputs
Rack-by-Rack PLC Component Details
Rack 1 – Safety PLC (GuardLogix)
Slot 1 Part # 1768-PB3 CompactLogix L4x DC In Power Supply (120/220VAC - 24VDC)
Slot 2 Part # 1768-ENBT CompactLogix EtherNet/IP Module
Slot 3 Part # 1768-ENBT CompactLogix EtherNet/IP Module
Slot 4 Part # 1768-L43S GuardLogix Safety Controller (2M/0.5M)
Rack 2 – Standard Control PLC
Slot 1 Part # 1768-PB3 Power Supply
Slot 2 Part # 1768-ENBT EtherNet/IP Module
Slot 3 Part # 1768-L43 Controller (2MB)
Slot 4 Part # MVI69E-GSC ProSoft ASCII Communication Module
Slots 5 through 7 Part # 1769-IF8 3x Analog Input Modules
Slot 8 Part # 1769-OF4 4-Channel Analog Output
Slot 9 through 11 Part # 1769-IQ16 3x Digital Input Modules (10–30VDC)
Slot 12 1769-OB16 Digital Output Module (20.4–26.4VDC)
Rack 3 – Safety Digital I/O
Slot 1 Part # 1734-AENTR – Network Adaptor
Slot 2,4,6,8,10,12,14,16,18, and 20(Even) Part # Alternating 1734-IB8S and 1734-OB8S
All odd slots: 1734-CTM Terminal Spacers
Slot # 10 & 21: 1734-EP24DC and 1734-FPD
Rack 4 – Safety Analog I/O
Slot 1 Part # 1734-AENTR
Slot 2,4,6,8,10,12,14, and 16 Part # 1734-IE4S Safety Analog Input Modules
Odd slots Part # 1734-CTM Terminal Modules
Slot 8 Part # 1734-EP24DC
Component Summary Totals
Controllers: 1x L43, and 1x L43S Safety Controller
Ethernet/IP: 3 Modules (1768-ENBT)
Questions buyers ask
What capacity and product purity does it produce?
This is a control enclosure, not a production unit—it doesn't produce anything. It houses the PLC, I/O, and safety systems that would command field devices (valves, compressors, dispensers, etc.) at an LNG fueling station or similar industrial site. The dual-PLC architecture with dedicated safety controller (L43S) and extensive safety-rated I/O suggests it was designed to manage a moderately complex process with SIL-rated interlocks, but what capacity or throughput it controlled depends entirely on the field equipment it was wired to.
What utilities, footprint and power draw does it require?
The enclosure is 10x10 feet. The two 1768-PB3 power supplies accept 120/220VAC input and produce 24VDC for the control system; the listing does not specify total amp draw or utility requirements beyond that. Control panels like this typically draw modest power—a few hundred watts to low single-digit kW depending on populated I/O and auxiliary loads—but you'll need the seller to confirm actual load and whether HVAC, lighting, or UPS were installed inside the enclosure.
How long was it in service, how long has it been down, and how was it preserved?
The listing states this is new surplus, which typically means it was built but never commissioned or saw minimal runtime before project cancellation. The unit was built in 2014, so it has been sitting for roughly a decade; the listing does not describe storage conditions, whether components were energized periodically, or if batteries in the controllers have been maintained. Ask the seller for storage environment details and whether PLC battery backups have been replaced, as lithium batteries in Allen-Bradley controllers degrade whether powered or not.
What is realistically involved in relocating and re-erecting it?
This is a 10x10 enclosed control center, so transport will require rigging and a flatbed or comparable truck; confirm with the seller whether lifting lugs or a skid base are present. On-site, you'll need a pad or concrete housekeeping slab, conduit runs to field I/O and power, and Ethernet infrastructure if integrating with SCADA or remote monitoring. Because it's prewired and rack-mounted, the internal hardware is relocatable as-is, but expect to rewrite or heavily modify the PLC logic unless your application closely mirrors LNG dispensing—the safety interlocks, I/O mapping, and HMI tags were all configured for the original project.
General guidance for this type of equipment. Ask about this specific unit in your inquiry — the seller answers directly.
Inspection, shipping & payment
Inspection
Pre-purchase inspections are welcome during normal business hours by appointment arranged in advance. We can provide complimentary transportation from DFW Airport and back if you would like to send someone to see the equipment in person. We can also walk through the item over a video call for domestic or international buyers. We are on US Central Time.
Shipping and loading
The equipment is located at our yard south of Dallas, Texas. We can assist with shipping arrangements.
Loading is provided at no charge for equipment under 15,000 lb when scheduled in advance. Equipment over 15,000 lb requires a crane, which is arranged and paid for by the buyer.
Payment
Payment in full is required FOB our yard in South Dallas. A verifiable cashier's check is accepted for collection in person. For release to a third-party shipper we require a wire transfer cleared in our account before the equipment leaves the yard.
Terms set by Gas Equipment 4 Sale.