NEW Helium Tube Skid - 160,000 SCF at 3161 PSI. 40ft trailer with 34K GVWR
NewSpecifications
Description
NEW Helium Tube Skid - 160,000 SCF at 3161 PSI. 40ft trailer with 34K GVWR
Brand new 2024 Enric helium tube skid mounted on a 40 ft trailer, rated for 3161 psi working pressure with 741.6 cu. ft. water capacity. The unit is containerized, licensed and approved for immediate deployment in the US. Available for sale. Please call for current lead time.
For Sale Brand New Helium Skid Trailer
Technical Specifications
Year: 2024
Helium Tube Skid
Manufacturer: Enric
Total Water Capacity: 741.6 cu. ft. Working Pressure: 3161 psi
Test Pressure: 4742 psi
Dimensions: 40'x8'6.43
Container Number: CICU4824416
Trailer Details
Trailer Chassis Manufacturer: Chassis King, Year: 2024, GVWR: 75,000 lbs
VIN# 1C9CK4323RA681171
Licensed and approved for immediate deployment in the US.
The trailer is available for sale We can supply multiple units if required. Please contact for more information about your projects so that we can discuss.
Inspection, shipping & payment
Terms set by Gas Equipment 4 Sale.
Have one like this? Sell it on Metal Mountain →
Seller
Gas Equipment 4 Sale
Waxahachie, TX, United States
Business and location confirmed by Metal Mountain.
Questions buyers ask
What is the MAWP and capacity at service pressure?
Working pressure is 3,161 PSIG with 741.6 cu ft water capacity, which the seller states yields 160,000 SCF of helium at working pressure. Test pressure is 4,742 PSIG. Tube skids are typically sized by their water volume and rated pressure; the SCF figure represents gas storage capacity using the compressibility factor for the specific gas at the stated pressure and temperature basis.
What should I inspect before putting it into service?
Verify all certification markings, data plates, and original hydrostatic test documentation are present and legible. Inspect tube bundle mounting, piping connections, valves, and pressure relief devices for shipping damage, and confirm the trailer brake system, lighting, and DOT placarding (if applicable) are complete. On tube skids, check for proper tie-down security of the tube bundle to the frame, examine all welds and fittings for damage, and ensure isolation valves cycle properly before pressurizing.
General guidance for this type of equipment. Ask about this specific unit in your inquiry — the seller answers directly.