DOT 3AA Nitrogen Storage Module – 122 Cu Ft | 2640 PSIG | 20,000 SCF/N2/AR/HE Ready to Go
This is a 2011 CPI skid-mounted nitrogen storage module built to DOT 3AA-2400 specification with 25 tube banks, rated for 2,640 PSIG operating pressure and stamped for 10% overfill. The system provides 122 cubic feet water volume with a flow capacity of 20,000 SCF, suitable for nitrogen, argon, or helium service. Construction is carbon steel, dimensions are 15' L x 8' W x 6' H, and the unit weighs 15,000 lbs. Hydrostatic retest is due 11-17-27.
Technical Specifications
Year of Manufacture: 2011
Total Water Volume: 122 Cu Ft
Design Pressure / MAWP: 2,400 PSIG
Flow Capacity: 20,000 SCF Nitrogen
Primary Service: Nitrogen (N₂)
Specification: DOT 3AA
Construction: Carbon Steel | DOT 3AA
Dimensions: 15' L x 8' W x 6' H
Weight: 15,000 LBS.
Restest Due: 11-17-27
Inspection, shipping & payment
Terms set by Gas Equipment 4 Sale.
Price on Request
Have one like this? Sell it on Metal Mountain →
Seller
Gas Equipment 4 Sale
Waxahachie, TX, United States
Business and location confirmed by Metal Mountain.
Questions buyers ask
Is this ASME or DOT rated, and what does that allow me to do with it?
This is DOT rated—specifically DOT 3AA-2400 with 10% overfill stamping, giving it a 2,640 PSIG operating pressure. DOT vessels are transportable as cargo and can be moved between sites, refilled from tube trailers or bulk sources, and used as mobile or semi-permanent storage; ASME vessels by contrast are typically fixed installations. The DOT 3AA specification indicates seamless carbon steel construction suitable for high-pressure compressed gas service including nitrogen, argon, and helium as stated in the listing.
What is the MAWP and capacity at service pressure?
The MAWP is 2,400 PSIG, and with the 10% overfill stamp the operating pressure is 2,640 PSIG. The listing states 122 cubic feet water volume with a flow capacity of 20,000 SCF—verify with the seller whether that SCF rating is at the 2,400 PSIG design pressure or the 2,640 PSIG operating pressure, as that distinction affects how much usable gas you'll have at your facility's delivery pressure.
What is the requalification or inspection status?
Hydrostatic retest is due 11-17-27, meaning the unit is currently in-service and valid through that date. DOT 3AA tube banks typically require hydrostatic requalification every five years, so plan for that expense and downtime cycle if you're evaluating long-term use.
What should I inspect before putting it into service?
Verify the DOT stampings and serial numbers match the retest documentation, inspect all manifold connections and valves for corrosion or damage, and check the skid frame for structural integrity given the 15,000 lb weight. Request the complete retest records and any service history, confirm what gas was last stored (the listing indicates nitrogen service but previous contamination can limit future use), and have a qualified inspector pressure-test the system and verify all pressure relief devices are within their service dates.