ANGI Energy Systems Natural Gas Dryer Skid with Controls, Motor, and Cooler
UsedSpecifications
Description
ANGI Energy Systems Natural Gas Dryer Skid with Controls, Motor, and Cooler
This is a 2014 ANGI Energy Systems natural gas dryer skid, model GD-018-S-M-460-150-2, rated for 150 PSIG. The skid includes an integrated ANGI electrical control panel rated for Class I, Div 2 hazardous locations, a Baldor 1 HP TEFC motor (230/460V, 3-phase), an AKG air cooler rated to 250 PSI and 250°F, and a Sivon pressure vessel with MAWP of 150 PSI at 250°F. Control panel is NEMA 3R or 4 with an explosion-proof Adalet junction box rated for Class I and II hazardous locations.
BALDOR Industrial Motor
Model: M34A63-232MD
Voltage: 230/460V, 3 Phase
Amps: 2/1
RPM: 3450
Frame: 56C
Service Factor: 1.25
Enclosure: TEFC (Totally Enclosed Fan Cooled)
Efficiency: 68% NEMA
ANGI Electrical Control Panel
Job Number: 40936-02
Schematic: E46-00-003
Primary: 120VAC, 5 Amps, 1 Phase
Secondary: 24VDC, 5 Amps
Enclosure Rating: NEMA 3R or 4
Hazardous Location Class: Class I, Div 2, Groups A, B, C, D
Short Circuit Rating: 5kAIC
ADALET Explosion-Proof Junction Box
Model: XDE 162328 N4
Rated for: Class I, Groups B, C, D | Class II, Groups E, F, G
Enclosure Type: NEMA Type 4 for Hazardous Locations
Voltage Rating: 600 VAC / 600 VDC
Certification: UL Listed
AKG Thermal Systems Air Cooler
Part Number: CC200-50232
Order No.: CO-52176
Max Working Pressure: 250 PSI
Max Working Temperature: 250°F
Manufacture Date: 9/23/2014
Application: Oil / Air / Water cooling compatible
Sivon Industries Pressure Vessel
Serial Number: 0781418
MAWP: 150 PSI @ 250°F
MDMT: -20°F @ 150 PSI
Manufacture Year: 2014
Certified Location: Marinette, Wisconsin, USA
Inspection, shipping & payment
Terms set by Gas Equipment 4 Sale.
Price on Request
Have one like this? Sell it on Metal Mountain →
Seller
Gas Equipment 4 Sale
Waxahachie, TX, United States
Business and location confirmed by Metal Mountain.
Questions buyers ask
What utilities, footprint and power draw does it require?
The skid requires 230/460V three-phase power for the 1 HP Baldor motor (drawing 2 amps at 460V or 1 amp at 230V under load) and 120VAC single-phase, 5 amp supply for the control panel. The listing does not provide skid dimensions, weight, instrument air requirements, or cooling water demand if the AKG air cooler was supplemented with evaporative cooling—request a general arrangement drawing and utility consumption data. Natural gas dryer skids of this type typically include regeneration gas circulation and may require vent gas disposal depending on process design.
How long was it in service, how long has it been down, and how was it preserved?
The listing does not state service history, decommissioning date, or preservation method. Desiccant beds can adsorb atmospheric moisture during storage, and seals and gaskets may have aged depending on storage conditions—ask the seller for run hours, last operational date, reason for removal, and whether vessels were purged, blinded, and desiccant was left in place or removed. Motors and controls stored outdoors without climate control often require testing or refurbishment even if the pressure boundary is sound.
What is realistically involved in relocating and re-erecting it?
As a skid-mounted unit, this should lift and transport intact if tie-down points and center of gravity are known—request skid dimensions, weight, and any shipping drawings. The Sivon pressure vessel will require registration and possible inspection in the destination jurisdiction; MAWP of 150 PSI at 250°F and the 2014 NB stamp should transfer, but some states require re-inspection after relocation. Hazardous location wiring (Class I Div 2 panel, Class I/II junction box) must be installed by qualified personnel familiar with NEC Article 500.
General guidance for this type of equipment. Ask about this specific unit in your inquiry — the seller answers directly.