18,800 Gallon LNG Cryogenic Storage Tank – 70 PSI – Process Engineering
Used
Specifications
ManufacturerProcess Engineering Inc
ModelH-18800-8 ELLIP2:1
Year1997
ConditionUsed
Capacity18,800 gallons (62,720 lbs of LNG)
Pressure Rating70 PSIG
Gas ServiceLNG
LocationWaxahachie, TX, United States
Stock #GE4S-1226
Description
Process Engineering Inc H-18800-8 ELLIP2:1 cryogenic storage tank with 18,800 gallon capacity (approximately 62,720 lbs of LNG), rated for 70 PSIG at 100°F with external vacuum. Built in 1997 with vacuum-jacketed construction for thermal insulation, ASME U-Stamp certified with RT-1 full radiography, National Board Number 10650. This listing covers the inner cryogenic vessel; the data plate is mounted externally with the original also attached to the inner vessel.
Design Pressure (MAWP): 70 PSIG @ 100°F (with external vacuum)
Minimum Design Metal Temperature (MDMT): 260°F @ 70 PSIG
Head Type: 2:1 Elliptical
Head Radius: 18,800
Minimum Head Thickness: 0.428 inches
Shell Thickness: 0.188 inches
Certifications: ASME U-Stamp, RT-1, UHT, W Stamp
National Board Number: 10650
Use Case: Inner cryogenic vessel with outer vacuum jacket (this is a duplicate plate for the internal tank)
Designed specifically for liquefied natural gas (LNG) storage
Vacuum-jacketed for superior thermal insulation
Built to ASME code with full radiography (RT-1) and high-temp service rating
Stainless steel construction
Designed for trailer transport to site empty and use as storage on site
Data plate mounted externally; original also attached to the inner vessel
Applications:
Ideal for LNG storage at fueling stations, industrial energy systems, or midstream energy infrastructure.
Industrial gas supply, backup cylinder banks, laboratory gas distribution, high-purity gas systems
Questions buyers ask
What is the current vacuum reading, and what is the NER?
The listing does not provide the current vacuum reading or normal evaporation rate (NER). Request the most recent vacuum gauge reading in microns and the measured NER in pounds or gallons per day—these figures indicate insulation integrity and operating economics. On vacuum-jacketed LNG tanks, readings above 50 microns typically signal degraded insulation, and NER should be well under 0.5% of capacity per day for a tank of this size.
Is the data plate legible, and is the U-1A available?
The listing states the data plate is mounted externally with the original also attached to the inner vessel, and provides the National Board Number 10650, but does not confirm legibility or U-1A availability. Request photos of both plates showing all stamped information clearly, and ask for the original U-1A manufacturer's data report—jurisdictions typically require these documents for re-certification and some will not accept reproductions.
What is involved in relocating and re-commissioning it?
The listing notes it was designed for trailer transport to site when empty, but provides no information on current installed condition, connections, or foundation. Ask whether it's skid-mounted or on a permanent pad, what needs to be disconnected, and if any permits are required for removal. Re-commissioning typically requires vacuum system integrity testing, pressure testing, relief valve recertification, and jurisdictional inspection with the U-1A and National Board documentation before returning to LNG service.
General guidance for this type of equipment. Ask about this specific unit in your inquiry — the seller answers directly.
Inspection, shipping & payment
Inspection
Pre-purchase inspections are welcome during normal business hours by appointment arranged in advance. We can provide complimentary transportation from DFW Airport and back if you would like to send someone to see the equipment in person. We can also walk through the item over a video call for domestic or international buyers. We are on US Central Time.
Shipping and loading
The equipment is located at our yard south of Dallas, Texas. We can assist with shipping arrangements.
Loading is provided at no charge for equipment under 15,000 lb when scheduled in advance. Equipment over 15,000 lb requires a crane, which is arranged and paid for by the buyer.
Payment
Payment in full is required FOB our yard in South Dallas. A verifiable cashier's check is accepted for collection in person. For release to a third-party shipper we require a wire transfer cleared in our account before the equipment leaves the yard.