CCH Custom Build 92K LP-H — 92,000 gal 700 PSIG Cryogenic Skid
Specifications
Description
Questions buyers ask
What is the current vacuum reading, and what is the NER?
The listing does not provide the current vacuum reading or normal evaporation rate. Request these from the seller along with the date of last vacuum measurement, as vacuum degradation is the primary indicator of inner vessel integrity and insulation performance on units that have been in storage or out of service.
Is the data plate legible, and is the U-1A available?
The listing does not confirm data plate condition or U-1A documentation availability. Ask the seller for photographs of the data plate and confirmation that the U-1A (ASME manufacturer's data report) is on file, as these are required for recertification and to verify the vessel's design pressure, MAWP, and original construction code year.
What is involved in relocating and re-commissioning it?
The unit is mounted on a 20-foot ISO skid, which simplifies transport and allows standard container handling equipment for loading and offloading. Re-commissioning typically requires vacuum system verification or re-evacuation if the hold time has degraded, hydrostatic or pneumatic testing if out of certification, relief valve recertification, and instrument calibration, along with product-specific cleaning if converting service.
General guidance for this type of equipment. Ask about this specific unit in your inquiry — the seller answers directly.
Inspection, shipping & payment
Terms set by Gas Equipment 4 Sale.
Price on Request
Seller
Gas Equipment 4 Sale
Waxahachie, TX, United States
Business and location confirmed by Metal Mountain.